Spring Release - Trello and Asana Integrations

If you've ever scoped a project in Wethos and then rebuilt the same task list in a project management tool so you could actually execute it, you know the pain: Two tools, two sources of truth, and an ongoing tax every time scope shifts.

Now, Wethos integrates directly with Trello and Asana, allowing you to link a board while you’re creating a proposal. No more copy-pasting tasks between tools. No more triple-checking you didn’t miss anything before you start doing the work.

Even better: if a PM board ever fails to create, you'll see the actual error from Trello or Asana instead of a generic "something went wrong." That means less guesswork and more "oh, that's the fix," whether it's a permission issue, an API token, or a board name conflict.

There’s lots of other little improvements for your workflow in this release too. Check them all out in the full release notes:

What's New

Project Management Tool Integrations

Teams can now connect their favorite PM tools directly in Wethos. Link your boards during proposal creation and keep project tracking in sync — no more copy-pasting between tools.

"Use My Location" on Onboarding

Getting started is faster: new users can auto-fill their location during onboarding instead of typing it manually.

Filter Pills on the Projects Page

Active filters on /projects now show as removable pill tags next to the status button — clear exactly what you're filtering without hunting through menus.

AI Agent Toggle — Info Tooltip

The AI agent toggle in the proposal editor now has a tooltip explaining what it does, so your team knows what they're enabling before they flip the switch.

Improvements

Smarter Error Messages for Integrations

When a PM board fails to create, you'll now see the actual error from the provider instead of a generic fallback — making it much easier to know what needs fixing.

Better Accessibility (WCAG 2.0 A/AA)

We've resolved a round of accessibility violations across the app. Screen reader users and keyboard navigators will notice improved link labels and better interactive element support.

Accurate Project Charts

Fixed y-axis scaling, x-axis ranges, and scatter chart marker offsets on the Projects value-vs-duration charts — the numbers now match what you'd expect.

Upload Improvements

Corrected file size limits and added drop zone hint text so it's clear what's accepted before you try to upload.

Reliable Login Flow

Fresh user data is always fetched on login, preventing stale-state issues after session changes.

Payment Schedule Date Guard

The minimum selectable send date in payment schedules is now enforced as tomorrow — no more accidentally scheduling same-day sends.

Previous
Previous

New scopes and services added

Next
Next

Signatures are here - Sign & send your proposals